!!

Welcome to our Forum, extension and content sharing platform of Electrical Test and Measurement Product Reviews Blog.

 
Registration this is Free, we accept contributors of 17 years old and above. We do not accept registration with Gmail

Active since 7 June 2012  


Copyright Notice: Entire ITTSB.EU content & images they are copyright protected. - Forum search engine disabled to Guests - No need of you using Adblock software.

Author Topic: Heavy duty Toggle Switch | DPDT DPDT | How to attach wire at screw terminal?  (Read 5123 times)

0 Members and 2 Guests are viewing this topic.

Online Kiriakos GR

  • Administrator
  • Hero Member
  • *****
  • Join Date: May 2012
  • Location: Greece
  • Posts: 2306
  • Country: gr
    • ittsb.eu
  • job title: Industrial Maintenance Electrician
While I do use heavy duty Toggle Switch DPDT or  DPDT in the past 35 years, I have never receive special training about connecting the wire over screw terminal.

DPDT / DPDT  for general use can be found with soldering tabs too.
But for my latest project, all I could find was with screw terminals.

Plain human logic in use, toggle switch screw terminals these its best to be paired with solid copper wire.

But with multi-core wire:
And if you plan to get highest performance along connectivity perfection?
And if you care for easy way to replace an damaged toggle switch?
And if you do not wish to overheat switch body with 300C of soldering?


Then a new solution it should be used...

Here is my answer which I came to this all alone, that is the use of fork-style shoe.
But there is a catch, you need to have stock of the one's with the appropriate dimensions.

Few samples that I did use at my DEMO presentation they are larger than needed only at center hole diameter.
The appropriate dimensions = 7mm wide /  3mm hole diameter. ;)
 
WWW.ITTSB.EU   Industrial Test Tools Scoreboard  (Product Reviews Blog) / Editor in Chief.
The content of this Web site is copyright protected

Online overvolt

  • Industrial installer Electrician
  • Global Moderator
  • Full Member
  • *****
  • Join Date: May 2012
  • Posts: 112
  • Country: gr
Good advice, what about alternatives ?  :)

Teasing you.  ;D

Online Kiriakos GR

  • Administrator
  • Hero Member
  • *****
  • Join Date: May 2012
  • Location: Greece
  • Posts: 2306
  • Country: gr
    • ittsb.eu
  • job title: Industrial Maintenance Electrician
Good advice, what about alternatives ?  :)

Teasing you.  ;D

Haha .... 
Today I had a visit of another expert electrician, and I did share my challenge with him (Sofoklis), name of ancient philosopher.
And I got a fresh golden idea.

I have over 70 of these male clips in storage, that now I can use after drilling an 30mm hole over them.
I did prepare 22 of these modified clips, and I am ready to move on, my project with out further spending of cash.  ;)

Enjoy the proofs!
When electricians working in pairs they are unbeatable ... Lol    8)
WWW.ITTSB.EU   Industrial Test Tools Scoreboard  (Product Reviews Blog) / Editor in Chief.
The content of this Web site is copyright protected

Offline cluca1969

  • Jr. Member
  • **
  • Join Date: Nov 2018
  • Location: Bucharest
  • Posts: 26
  • Country: ro
  • job title: Electronics developer
Good idea, it seems simple, but with ideas don't rain when we need them.

Online Kiriakos GR

  • Administrator
  • Hero Member
  • *****
  • Join Date: May 2012
  • Location: Greece
  • Posts: 2306
  • Country: gr
    • ittsb.eu
  • job title: Industrial Maintenance Electrician
Good idea, it seems simple, but with ideas don't rain when we need them.

That's true.
In my local market, 25 pieces of these shoes or clips, they come for 0.20E its one.
= 4.60E were saved   :) 

And there is not stock of everything.
WWW.ITTSB.EU   Industrial Test Tools Scoreboard  (Product Reviews Blog) / Editor in Chief.
The content of this Web site is copyright protected

Offline Andrew-88

  • Full Member
  • ***
  • Join Date: May 2017
  • Posts: 136
  • Country: gr
  • job title: Electrician
Web shop at Athens (capital) these are less hostile, but stock availability this is an issue.
About eight years was imposed capital controls in Greece, then approximately thee years Covid-19, sum is eleven years of market slowdown, small demand, no imports.
Nowadays what ever gets restocked there is 50% on-top, with all this negative background, Kiriakos he is well justified to create modified clips.  :)

If he was after of large quantities, other solutions still exist.     

Online Kiriakos GR

  • Administrator
  • Hero Member
  • *****
  • Join Date: May 2012
  • Location: Greece
  • Posts: 2306
  • Country: gr
    • ittsb.eu
  • job title: Industrial Maintenance Electrician
Even at DIY projects you should always think as contractor.  :)
(It is required to do savings when this is possible.)

Or else, the bill about the required parts, this will significantly inflates.
 
https://www.ittsb.eu/forum/index.php?topic=1745.0 
WWW.ITTSB.EU   Industrial Test Tools Scoreboard  (Product Reviews Blog) / Editor in Chief.
The content of this Web site is copyright protected

 

ITTSB.EU Blog

General Data Protection Regulation GDPR ITTSB.EU Home Page Reward us by a Donation - Sponsorship TsDMMViewer Data Logger for FLUKE 884xA

ITTSB Blog - Sponsors

protosnet.com - Internet solutions FLUKE benchtop DMM Repair Services

Recommended Links

Hellenic Accreditation System E.SY.D. Portal of city Volos - Greece Clean Up and Customize Facebook Firefox Backup Tool 32bit / 64 bit Winaero Tweaker = Win7 Fonts size fix